现在装修房子对于噪音有哪些具体要求呢

  • 作者: 朱雨沫
  • 来源: 投稿
  • 2024-12-19


1、现在装修房子对于噪音有哪些具体要求呢

住宅室内噪音控制要求

根据《住宅设计规范》(GB )中的相关规定,住宅室内噪音控制要求如下:

一、室内空气声环境

起居室、卧室等一般房间的昼间等效声级不应大于45 dB(A);

起居室、卧室等一般房间的夜间等效声级不应大于35 dB(A);

厨卫等功能房间的昼间等效声级不应大于55 dB(A);

二、室内固体声环境

卧室和主起居室的楼层冲击声声级不应大于65 dB(A);

厨卫等功能房间的楼层冲击声声级不应大于75 dB(A)。

三、住宅外噪音控制

住宅建筑外围环境噪声不应高于以下限值:

白天等效声级不应大于60 dB(A);

夜间等效声级不应大于50 dB(A)。

四、噪声隔声要求

住宅建筑的外围护墙和外窗的隔声性能应满足相应的隔声标准,以保证室内噪音满足上述要求。

五、噪声源控制

住宅建筑中的噪声源,如空调、排气扇等设备的选用和安装应考虑其噪声对室内环境的影响。

注意:

等效声级(Leq):指在一定时间段内,声压以每秒1次的速度对数平均后的声压水平。

dB(A):分贝(A计权),是一种考虑人耳对不同频率声音敏感性而设计的声级测量单位。

2、现在装修房子对于噪音有哪些具体要求呢英语

Specific Noise Requirements for Home Renovations

To minimize noise pollution and ensure the wellbeing of residents, there are specific noise requirements that must be adhered to during home renovations. These requirements vary based on the time of day and the location of the property.

Timing Restrictions

Weekdays: Renovations may typically be conducted between 7:00 AM and 8:00 PM.

Weekends and Holidays: Renovations may be restricted to certain hours, such as 10:00 AM to 6:00 PM.

Decibel Limits

Residential Areas: Noise levels should not exceed 55 decibels (dB) during daytime hours (7:00 AM to 8:00 PM) and 50 dB during nighttime hours (8:00 PM to 7:00 AM).

Commercial Areas: Noise levels may be higher, up to 70 dB during daytime hours and 60 dB during nighttime hours.

Equipment Restrictions

Noisy equipment, such as jackhammers or power saws, may be prohibited during certain hours or restricted to specific areas.

Contractors should use noisereducing measures, such as silencers or enclosures, to minimize the impact of equipment noise.

Soundproofing and Mitigation

Renovators may be required to install soundproofing materials in walls, floors, and ceilings to reduce noise transmission.

Temporary noise barriers can be used to shield noise from neighboring properties.

Quiet Hours

Some municipalities may designate certain hours as "quiet hours" during which all noise levels must be kept to a minimum.

During quiet hours, only essential renovations, such as emergency repairs, may be permitted.

Enforcement

Local authorities may be responsible for enforcing noise regulations.

Residents or neighbors can report excessive noise to the authorities, who may issue fines or other penalties.

Consequences of NonCompliance

Fines or penalties

Stopwork orders

Project delays

Negative impact on the reputation of the contractor

Note: These noise requirements may vary based on the specific laws and regulations of your municipality. It is essential to check with local authorities to confirm the applicable noise regulations and obtain necessary permits before commencing any renovations.

3、现在装修房子对于噪音有哪些具体要求呢视频

装修噪音具体要求
住宅楼

工作时间:7:0012:00,14:0018:00

禁止时间:18:00次日7:00,法定节假日、休息日全天

允许使用低噪音电钻(噪声小于85分贝)

非住宅楼

工作时间:8:0012:00,14:0018:00

禁止时间:18:00次日8:00,法定节假日、休息日全天

低噪声电钻使用无限制

其他要求

噪声限值:住宅楼昼间65分贝、夜间55分贝;非住宅楼昼间70分贝、夜间60分贝

使用静音工具,减少噪音

加强噪声治理,如门窗隔音条、墙体隔音材料

未经物业同意,不得擅自使用大型发电机

违反规定,可被责令停止作业、处以罚款

4、装修的噪音期一般持续多久

装修噪音期的持续时间因项目的规模和复杂性而异,但一般持续以下天数:

轻微装修(油漆、更换地板):12 天

中等装修(拆除墙壁、安装新橱柜):24 周

重大装修(扩建、改造):4 周以上

以下因素会影响噪音期的持续时间:

项目规模:房间数量、房屋面积和改造程度

工人数量:同时工作的工人越多,噪音越大

工序顺序:拆除和施工等嘈杂工序的时间安排

材料类型:使用硬木地板或瓷砖等坚硬材料会产生更多噪音

隔音措施:采取适当的隔音措施(如使用隔音棉)可以减少噪音水平

请注意,这些估计值仅供参考,实际噪音期可能会根据具体情况而有所不同。建议与承包商沟通以获得更准确的时间表。